Hicksville, Nassau County, New York · NYISO · operated by Calpine Eastern Corp · owned by CPN Management LP
2023 · headline year
Fuel spend$17.1M2023 · estimate
Capacity in service240MW6 units · gas
Net generation595GWh2023 · reported
CO₂ emitted315,227t2023 · reported to EPA · 1,208th highest of 6,030 in the US
Rank in New York#34of 1,018 · by capacity · #1,253 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor28%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 5.58 TBtu · reported · $17.1M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
7 of 7 shown · 240 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN5
60.0
Natural Gas
Natural Gas Fired Combustion Turbine
2002
Operating
Unit GEN6
60.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit GEN7
36.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit GEN1
33.7
Natural Gas
Natural Gas Fired Combined Cycle
1989
Operating
Unit GEN2
33.7
Natural Gas
Natural Gas Fired Combined Cycle
1989
Operating
Unit GEN3
16.2
Natural Gas
Natural Gas Fired Combined Cycle
1989
Operating
Unit GEN4
0.4
Distillate oil
Petroleum Liquids
1989
Retired 2024
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 156 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
240 MW across 6 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by CPN Management LP (100%) and operated by Calpine Eastern Corp, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1999. The oldest operating units are Unit GEN1, Unit GEN2 and Unit GEN3 (1989); the newest are Unit GEN6 and Unit GEN7 (2005).
When is it due to retire?
No retirement date has been filed for any operating unit at Bethpage Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $17.1M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
315,227 t in 2023, reported to the EPA — the 1,208th highest of 6,030 US facilities that reported. Up from 198,207 t in 2011.