Bethlehem, Northampton County, Pennsylvania · PJM · operated by Calpine Bethlehem LLC · owned by CPN Management LP
2023 · headline year
Fuel spend$150M2023 · estimate
Capacity in service1,153MW8 units · gas
Net generation5.99TWh2023 · reported
CO₂ emitted2.64Mt2023 · reported to EPA · 206th highest of 6,030 in the US
Rank in Pennsylvania#15of 256 · by capacity · #251 of 13,147 US
Reported suppliers32023 · 17 deliveries
Capacity factor59%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 48.8 TBtu · reported · $150M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
8 of 8 shown · 1,153 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit STG4
195.5
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit STG8
195.5
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CTG1
127.0
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit CTG2
127.0
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit CTG3
127.0
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit CTG5
127.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CTG6
127.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CTG7
127.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 183 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by CPN Management LP (100%) and operated by Calpine Bethlehem LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. The oldest operating units are Unit CTG1, Unit CTG2 and Unit CTG3 (2002); the newest are Unit STG4, Unit STG8, Unit CTG5, Unit CTG6 and 1 more (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at Bethlehem Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 3 suppliers in 2023.
How much does it spend on fuel?
An estimated $150M in 2023 — natural gas $150M and oil & petroleum $17,561. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
2.64 Mt in 2023, reported to the EPA — the 206th highest of 6,030 US facilities that reported. Up from 1.88 Mt in 2011.