AMERICAN ENERGY ATLAS
Power·Alaska

Bernice Lake

Nikiski, Kenai Peninsula Borough, Alaska · operated by Homer Electric Assn Inc · owned by Homer Electric Assoc Inc

2023 · headline year
Fuel spend$14,1492023 · estimate
Capacity in service76.7MW3 units · gas
CO₂ emitted127t2023 · reported to EPA · 6,005th highest of 6,030 in the US
Rank in Alaska#10of 142 · by capacity · #2,828 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011

Location

Kenai Peninsula Borough

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1,941 MMBtu · reported · $14,149 est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 76.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 328.8Natural GasNatural Gas Fired Combustion Turbine1978Operating
Unit 427.2Natural GasNatural Gas Fired Combustion Turbine1981Operating
Unit 220.7Natural GasNatural Gas Fired Combustion Turbine1971Operating

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 12 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Homer Electric Assoc Inc · 100%
Operating utility
Homer Electric Assn Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1005268
EIA plant ID
6292

Common questions

How big is Bernice Lake?
76.7 MW across 3 generating units in service.
Who owns and operates it?
Owned by Homer Electric Assoc Inc (100%) and operated by Homer Electric Assn Inc, filed as cooperative.
How old is it?
The capacity-weighted average megawatt here came online in 1977. The oldest operating unit is Unit 2 (1971); the newest is Unit 4 (1981).
When is it due to retire?
No retirement date has been filed for any operating unit at Bernice Lake. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $14,149 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
127 t in 2023, reported to the EPA — the 6,005th highest of 6,030 US facilities that reported. Down from 34,065 t in 2011.

Related pages

Alaska energyAll facilities in the state→Nikiski Co-Generation80.8 MW operating capacity→ Snettisham78.2 MW operating capacity→ Hank Nikkels Plant One50.9 MW operating capacity→ Eklutna Hydro Project44.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming