AMERICAN ENERGY ATLAS
Power·Maryland

Berlin

Worcester County, Maryland · PJM · operated by Town of Berlin - (MD)

2023 · headline year
Fuel spend$30,1842023 · estimate
Capacity in service5.6MW3 units · oil + gas
Rank in Maryland#54 (tied)of 210 · by capacity · #6,449 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Worcester County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

57% Oil & petroleum · 1,188 MMBtu · reported · $26,663 est.43% Natural gas · 882 MMBtu · reported · $3,521 est.

Oil & petroleum supplies 57% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Berlin an estimated 5.6× more than natural gas — and oil & petroleum is 2 of its 3 operating units and 64% of operating capacity.

Reported fuel consumption, MMBtu · 2011–2023

02,0004,0006,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 5.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 5A2.5Distillate oilPetroleum Liquids1989Operating
Unit 8A2.0Natural GasNatural Gas Internal Combustion Engine2020Operating
Unit 1A1.1Distillate oilPetroleum Liquids1961Operating
Unit 2A1.8Distillate oilPetroleum Liquids1999Retired 2019
Unit 3A1.8Distillate oilPetroleum Liquids1999Retired 2004
Unit 4A1.8Distillate oilPetroleum Liquids2000Retired 2020
Unit 7A7.5Distillate oilPetroleum Liquidsnot reportedCanceled
Unit 6A5.0Distillate oilPetroleum Liquidsnot reportedCanceled

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Town of Berlin - (MD)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
6565

Common questions

How big is Berlin?
5.6 MW across 3 generating units in service — 3.6 MW of oil and 2.0 MW of natural gas. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Town of Berlin - (MD), filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1995. The oldest operating unit is Unit 1A (1961); the newest is Unit 8A (2020).
When is it due to retire?
No retirement date has been filed for any operating unit at Berlin. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum and natural gas.
How much does it spend on fuel?
An estimated $30,184 in 2023 — oil & petroleum $26,663 and natural gas $3,521. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Maryland energyAll facilities in the state→Bomber CSG6.0 MW operating capacity→ Church Hill6.0 MW operating capacity→ Spectrum Solar Hybrid5.6 MW operating capacity→ Herbert Farm Solar5.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming