Lander County, Nevada · NEVP · operated by Ormat Nevada Inc
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit OEC1 | 14.6 | Geothermal | Geothermal | 2024 | Operating |
| Unit OEC2 | 14.6 | Geothermal | Geothermal | 2024 | Operating |
| Unit BWSOL | 5.8 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit GEN1 | 17.0 | Geothermal | Geothermal | 1985 | Retired 2024 |
| Unit GEN2 | 3.6 | Geothermal | Geothermal | 2011 | Retired 2024 |
All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit BWSOL | new unit | 2025 | 5.8 MW |