AMERICAN ENERGY ATLAS
Power·California

Bear Mountain Limited

Bakersfield, Kern County, California · CAISO · operated by WCAC Operating Company · owned by Bear Mountain LTD

2023 · headline year
Fuel spend$3.73M2023 · estimate
Capacity in service46.0MW1 unit · gas
Net generation47.8GWh2023 · reported
CO₂ emitted21,205t2023 · reported to EPA · 5,383rd highest of 6,030 in the US
Rank in California#429 (tied)of 1,713 · by capacity · #3,632 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor12%2023

Location

Kern County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 447,624 MMBtu · reported · $3.73M est.

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 46.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN146.0Natural GasNatural Gas Fired Combustion Turbine1995Operating

1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Bear Mountain LTD · 100%
Operating utility
WCAC Operating Company
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1006139
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Kern River Gas Transmission Co
EIA plant ID
10649

Common questions

How big is Bear Mountain Limited?
46.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Bear Mountain LTD (100%) and operated by WCAC Operating Company, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1995.
When is it due to retire?
No retirement date has been filed for any operating unit at Bear Mountain Limited. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $3.73M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
21,205 t in 2023, reported to the EPA — the 5,383rd highest of 6,030 US facilities that reported. Down from 147,210 t in 2011.

Related pages

California energyAll facilities in the state→Red Bluff46.4 MW operating capacity→ Chalk Cliff Cogen46.0 MW operating capacity→ Mckittrick Limited46.0 MW operating capacity→ Live Oak Limited46.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming