Power·California
BCE Seal Beach
Orange County, California · CAISO · operated by BCE Seal Beach
Capacity shown is planned or not in service
Proposed
A planned 28.7 MW batteries project, filed to come online in 2025.
Planned capacity28.7MW2 units · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- BCE Seal Beach
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 68023
Common questions
How big is BCE Seal Beach?
28.7 MW across 2 units, none of which is in service — all planned.
Who owns and operates it?
Operated by BCE Seal Beach, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Batteries (16.7 MW) and Solar Photovoltaic (12.0 MW).
Related pages
Select a state