Fuel spend$02023 · no purchased fuel
Capacity in service126MW2 units · solar + storage
Rank in Nevada#31of 111 · by capacity · #2,068 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Battle Mountain Solar Project?
126 MW across 2 generating units in service — 101 MW of solar and 25.0 MW of storage.
Who owns and operates it?
Operated by Consolidated Edison Development Inc., filed as independent power producer.
Which grid does it sell into?
NEVP (Nevada Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2021. Every operating unit came online in 2021.
When is it due to retire?
No retirement date has been filed for any operating unit at Battle Mountain Solar Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (101 MW) and Batteries (25.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.