AMERICAN ENERGY ATLAS
Power·Texas

Barilla Solar

Pecos County, Texas · ERCOT · operated by Leeward Asset Management, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service30.2MW1 unit · solar
Rank in Texas#557 (tied)of 941 · by capacity · #4,006 (tied) of 13,147 US

Location

Pecos County · ERCOT · TRE

Generating units

2 of 2 shown · 30.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit BRLA30.2SolarSolar Photovoltaic2015Operating
Unit BARBA20.0StorageBatteriesnot reportedCanceled

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.

See the engineering record →

Ownership & operations

Operating utility
Leeward Asset Management, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
58710

Common questions

How big is Barilla Solar?
30.2 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Leeward Asset Management, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Barilla Solar. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (30.2 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Texas energyAll facilities in the state→Big Spring Wind Power Facility34.3 MW operating capacity→ Falcon Dam & Power31.5 MW operating capacity→ Seymour Hills Wind Project, LLC30.2 MW operating capacity→ Borger Carbon Black Plant30.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming