AMERICAN ENERGY ATLAS
Power·Kansas

Baldwin City Plant No 2

Douglas County, Kansas · SPP · operated by City of Baldwin City- (KS)

2023 · headline year
Fuel spend$9,9372023 · estimate
Capacity in service8.6MW3 units · gas + oil · incl. 2.2 MW online after 2023
Net generation145MWh2023 · reported
Rank in Kansas#111 (tied)of 173 · by capacity · #5,842 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Douglas County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

80% Natural gas · 1,190 MMBtu · reported · $3,651 est.20% Oil & petroleum · 294 MMBtu · reported · $6,286 est.

Natural gas supplies 80% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Baldwin City Plant No 2 an estimated 7.0× more than natural gas.

Reported fuel consumption, MMBtu · 2011–2023

05,00010,00015,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 8.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 73.2Natural GasNatural Gas Internal Combustion Engine2004Operating
Unit 83.2Natural GasNatural Gas Internal Combustion Engine2004Operating
Unit 92.2Distillate oilPetroleum Liquids2024Operating
Unit 102.2Distillate oilPetroleum Liquids2025Proposed

All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →
UnitEventWhenMW
Unit 10new unit20252.2 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Baldwin City- (KS)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Southern Star Central Gas Pipeline
EIA plant ID
8020

Common questions

How big is Baldwin City Plant No 2?
8.6 MW across 3 generating units in service — 6.4 MW of natural gas and 2.2 MW of oil. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Baldwin City- (KS), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. The oldest operating units are Unit 7 and Unit 8 (2004); the newest is Unit 9 (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Baldwin City Plant No 2. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $9,937 in 2023 — natural gas $3,651 and oil & petroleum $6,286. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Kansas energyAll facilities in the state→Sterling10.3 MW operating capacity→ Minneapolis City of9.1 MW operating capacity→ Stockton8.6 MW operating capacity→ Meade8.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming