AMERICAN ENERGY ATLAS
Power·Kansas

Baldwin City Plant No 1

Douglas County, Kansas · SPP · operated by City of Baldwin City- (KS)

2023 · headline year
Fuel spend$4,3192023 · estimate
Capacity in service4.2MW3 units · oil
Net generation19MWh2023 · reported
Rank in Kansas#131of 173 · by capacity · #7,980 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Douglas County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 202 MMBtu · reported · $4,319 est.

Reported fuel consumption, MMBtu · 2011–2023

0250500750201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 4.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 42.0Distillate oilPetroleum Liquids1970Operating
Unit 51.1Distillate oilPetroleum Liquids1964Operating
Unit 61.1Distillate oilPetroleum Liquids1964Operating
Unit 31.1Distillate oilPetroleum Liquids1956Retired 2017

All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Baldwin City- (KS)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Southern Star Central Gas Pipeline
EIA plant ID
1262

Common questions

How big is Baldwin City Plant No 1?
4.2 MW across 3 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Baldwin City- (KS), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1967. The oldest operating units are Unit 5 and Unit 6 (1964); the newest is Unit 4 (1970).
When is it due to retire?
No retirement date has been filed for any operating unit at Baldwin City Plant No 1. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $4,319 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Kansas energyAll facilities in the state→Stafford4.9 MW operating capacity→ Erie4.3 MW operating capacity→ Burlingame4.0 MW operating capacity→ Fort Hays State University Wind Farm4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming