AMERICAN ENERGY ATLAS
Power·Texas

Azure Sky Solar

Haskell County, Texas · ERCOT · operated by Azure Sky Solar Project, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service316MW2 units · solar + storage
Rank in Texas#141of 941 · by capacity · #955 of 13,147 US

Location

Haskell County · ERCOT · TRE

Generating units

2 of 2 shown · 316 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ASKYS225.0SolarSolar Photovoltaic2021Operating
Unit ASKYB91.2StorageBatteries2022Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Azure Sky Solar Project, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
63905

Common questions

How big is Azure Sky Solar?
316 MW across 2 generating units in service — 225 MW of solar and 91.2 MW of storage.
Who owns and operates it?
Operated by Azure Sky Solar Project, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2021. The oldest operating unit is Unit ASKYS (2021); the newest is Unit ASKYB (2022).
When is it due to retire?
No retirement date has been filed for any operating unit at Azure Sky Solar. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (225 MW) and Batteries (91.2 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Texas energyAll facilities in the state→IP Radian, LLC320 MW operating capacity→ Bayou Cogeneration Plant318 MW operating capacity→ Pet Coke/Coal Fired Energy Generating Facility310 MW operating capacity→ Canyon Wind Project, LLC309 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming