AMERICAN ENERGY ATLAS
Power·Kansas

Augusta Electric Plant No 2

Butler County, Kansas · SPP · operated by City of Augusta - (KS)

2023 · headline year
Fuel spend$97,3522023 · estimate
Capacity in service20.7MW4 units · gas
Net generation1.35GWh2023 · reported
Rank in Kansas#81of 173 · by capacity · #4,395 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Butler County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

93% Natural gas · 20,650 MMBtu · reported · $63,354 est.7% Oil & petroleum · 1,590 MMBtu · reported · $33,998 est.

Natural gas supplies 93% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 20.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 46.7Natural GasNatural Gas Internal Combustion Engine2005Operating
Unit 36.0Natural GasNatural Gas Internal Combustion Engine1981Operating
Unit 14.0Natural GasNatural Gas Internal Combustion Engine1968Operating
Unit 24.0Natural GasNatural Gas Internal Combustion Engine1968Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Augusta - (KS)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Southern Star Central Gas Pipeline
EIA plant ID
6791

Common questions

How big is Augusta Electric Plant No 2?
20.7 MW across 4 generating units in service.
Who owns and operates it?
Operated by City of Augusta - (KS), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. The oldest operating units are Unit 1 and Unit 2 (1968); the newest is Unit 4 (2005).
When is it due to retire?
No retirement date has been filed for any operating unit at Augusta Electric Plant No 2. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $97,352 in 2023 — natural gas $63,354 and oil & petroleum $33,998. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Kansas energyAll facilities in the state→Sabetha Power Plant21.8 MW operating capacity→ Holton21.5 MW operating capacity→ Erie Energy Center20.0 MW operating capacity→ Johnson Corner Solar 120.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming