Fuel spend$02023 · no purchased fuel
Capacity in service241MW2 units · solar + storage
Rank in California#103of 1,713 · by capacity · #1,238 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Arlington Energy Center III?
241 MW across 2 generating units in service — 131 MW of solar and 110 MW of storage.
Who owns and operates it?
Operated by Arlington Energy Center III, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2022. Every operating unit came online in 2022.
When is it due to retire?
No retirement date has been filed for any operating unit at Arlington Energy Center III. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (131 MW) and Batteries (110 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.