Power·California
Aramis I Solar Project
Alameda County, California · CAISO · operated by IP Aramis, LLC
Capacity shown is planned or not in service
Proposed
A planned 200 MW solar photovoltaic project, filed to come online in 2026.
Planned capacity200MW2 units · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- IP Aramis, LLC
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 66678
Common questions
How big is Aramis I Solar Project?
200 MW across 2 units, none of which is in service — all planned.
Who owns and operates it?
Operated by IP Aramis, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Solar Photovoltaic (100 MW) and Batteries (100 MW).
Related pages
Select a state