American Crystal Sugar - Hillsboro

Hillsboro, Traill County, North Dakota · MISO · operated by American Crystal Sugar Co · owned by American Crystal Sugar Co

2023 · headline year
Fuel spend$7.25M2023 · estimate
Capacity in service13.3MW1 unit · coal
Net generation91.8GWh2023 · reported
CO₂ emitted488,893t2023 · reported to EPA · 944th highest of 6,030 in the US
Rank in North Dakota#49of 55 · by capacity · #5,063 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor79%2023

Location

Traill County · MISO · MRO

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Coal · 3.1 TBtu · reported · $7.21M est.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 13.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit G113.3SubbituminousConventional Steam Coal1990Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
American Crystal Sugar Co · 100%
Operating utility
American Crystal Sugar Co
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Minerals, Waste
EPA facility ID
1005753
Balancing authority
MISO
NERC region
MRO
EIA plant ID
54210

Common questions

How big is American Crystal Sugar - Hillsboro?
13.3 MW across 1 generating unit in service.
Who owns and operates it?
Owned by American Crystal Sugar Co (100%) and operated by American Crystal Sugar Co, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1990.
When is it due to retire?
No retirement date has been filed for any operating unit at American Crystal Sugar - Hillsboro. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned coal.
How much does it spend on fuel?
An estimated $7.25M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
488,893 t in 2023, reported to the EPA — the 944th highest of 6,030 US facilities that reported. Up from 417,388 t in 2011.

Related pages

North Dakota energyAll facilities in the state→Langdon Wind II LLC40.5 MW operating capacity→ Cedar Hills Wind Farm19.5 MW operating capacity→ Velva Windfarm LLC11.9 MW operating capacity→ Tesoro Mandan Cogeneration Plant7.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming