AMERICAN ENERGY ATLAS
Industrial + power·Minnesota

American Crystal Sugar - Crookston

Crookston, Polk County, Minnesota · MISO · operated by American Crystal Sugar Co · owned by American Crystal Sugar Co

2023 · headline year
Fuel spend$9.59M2023 · estimate
Capacity in service6.5MW2 units · coal
Net generation46.8GWh2023 · reported
CO₂ emitted304,856t2023 · reported to EPA · 1,226th highest of 6,030 in the US
Rank in Minnesota#159 (tied)of 767 · by capacity · #6,239 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor82%2023

Location

Polk County · MISO · MRO

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Coal · 2.12 TBtu · reported · $6.33M est.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 6.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit G13.5SubbituminousConventional Steam Coal1954Operating
Unit G23.0SubbituminousConventional Steam Coal1975Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
American Crystal Sugar Co · 100%
Operating utility
American Crystal Sugar Co
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Minerals, Waste
EPA facility ID
1006354
Balancing authority
MISO
NERC region
MRO
EIA plant ID
54212

Common questions

How big is American Crystal Sugar - Crookston?
6.5 MW across 2 generating units in service.
Who owns and operates it?
Owned by American Crystal Sugar Co (100%) and operated by American Crystal Sugar Co, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1964. The oldest operating unit is Unit G1 (1954); the newest is Unit G2 (1975).
When is it due to retire?
No retirement date has been filed for any operating unit at American Crystal Sugar - Crookston. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned coal.
How much does it spend on fuel?
An estimated $9.59M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
304,856 t in 2023, reported to the EPA — the 1,226th highest of 6,030 US facilities that reported. Up from 298,459 t in 2011.

Related pages

Minnesota energyAll facilities in the state→Athens MN CONX6.6 MW operating capacity→ South Generation6.6 MW operating capacity→ Chisago Solar6.5 MW operating capacity→ Dodge Center Solar6.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming