AMEA Sylacauga Plant

Sylacauga, Talladega County, Alabama · SOCO · operated by Alabama Municipal Elec Authority · owned by Alabama Municipal Electric Authority

2023 · headline year
Fuel spend$1.68M2023 · estimate
Capacity in service98.6MW2 units · gas
Net generation46.3GWh2023 · reported
CO₂ emitted28,404t2023 · reported to EPA · 4,870th highest of 6,030 in the US
Rank in Alabama#41of 75 · by capacity · #2,521 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor5%2023

Location

Talladega County · SOCO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 529,921 MMBtu · reported · $1.68M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 98.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 149.3Natural GasNatural Gas Fired Combustion Turbine2004Operating
Unit 249.3Natural GasNatural Gas Fired Combustion Turbine2004Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 24 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Alabama Municipal Elec Authority
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007178
Balancing authority
SOCO
NERC region
SERC
EIA plant ID
56018

Common questions

How big is AMEA Sylacauga Plant?
98.6 MW across 2 generating units in service.
Who owns and operates it?
Owned by Alabama Municipal Electric Authority (100%) and operated by Alabama Municipal Elec Authority, filed as municipally owned utility.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. Every operating unit came online in 2004.
When is it due to retire?
No retirement date has been filed for any operating unit at AMEA Sylacauga Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.68M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
28,404 t in 2023, reported to the EPA — the 4,870th highest of 6,030 US facilities that reported. Up from 5,047 t in 2011.

Related pages

Alabama energyAll facilities in the state→Black Bear Solar 1100 MW operating capacity→ Jordan Dam100 MW operating capacity→ SABIC Innovative Plastics - Burkville97.0 MW operating capacity→ Thurlow Dam91.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming