Power·Virginia

Altavista Power Station

Altavista, Campbell County, Virginia · PJM · operated by Virginia Electric & Power Co

last reported to the EPA in 2015

2023 · headline year
Capacity in service71.1MW1 unit · biomass
Net generation283GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2015
Rank in Virginia#62 (tied)of 230 · by capacity · #3,052 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2016
Capacity factor45%2023

Location

Campbell County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 4.68 TBtu · reported

CO₂ emitted, t · 2011–15

02,0004,0006,000201120132015
Reported (through 2015)

Generating units

1 of 1 shown · 71.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 171.1WoodWood/Wood Waste Biomass1992Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 38 deliveries are on record for 2012–2016.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Virginia Electric & Power Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001229
Balancing authority
PJM
NERC region
SERC
Gas pipeline
Transcontinental Gas Pipeline
EIA plant ID
10773

Common questions

How big is Altavista Power Station?
71.1 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Virginia Electric & Power Co, filed as investor-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1992.
When is it due to retire?
No retirement date has been filed for any operating unit at Altavista Power Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

Virginia energyAll facilities in the state→Pleinmont Solar 175.0 MW operating capacity→ Claytor74.8 MW operating capacity→ Hopewell Power Station71.1 MW operating capacity→ Southampton Power Station71.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming