Alpha Ridge Landfill

Marriottsville, Howard County, Maryland · PJM · operated by Howard County - Maryland · owned by Howard County of Maryland (inc)

2023 · headline year
Fuel spend$13,7772023 · estimate
Capacity in service1.0MW1 unit · biomass
Net generation1.46GWh2023 · reported
CO₂ emitted25,772t2023 · reported to EPA · 5,083rd highest of 6,030 in the US
Rank in Maryland#196 (tied)of 210 · by capacity · #12,215 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor17%2023

Location

Howard County · PJM · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 14,174 MMBtu · reported

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 1.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit JEN11.0Landfill gasLandfill Gas2012Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Howard County of Maryland (inc) · 100%
Operating utility
Howard County - Maryland
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007291
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
58252

Common questions

How big is Alpha Ridge Landfill?
1.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Howard County of Maryland (inc) (100%) and operated by Howard County - Maryland, filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2012.
When is it due to retire?
No retirement date has been filed for any operating unit at Alpha Ridge Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much does it spend on fuel?
An estimated $13,777 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
25,772 t in 2023, reported to the EPA — the 5,083rd highest of 6,030 US facilities that reported. Down from 26,095 t in 2011.

Related pages

Maryland energyAll facilities in the state→Sheriff Road1.1 MW operating capacity→ White Marsh Mall1.1 MW operating capacity→ 6685 Santa Barbara Ct1.0 MW operating capacity→ Anne Arundel County Public Schools1.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming