Kern County, California · CAISO · operated by Renewable Solar, Inc
Capacity shown is planned or not in service
A planned 1.2 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 19073 | 1.2 | Solar | Solar Photovoltaic | 2025 | Proposed |
1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 19073 | new unit | 2025 | 1.2 MW |