AMERICAN ENERGY ATLAS
Power·Georgia

Albany Green Energy

Albany, Dougherty County, Georgia · SOCO · operated by Albany Green Energy, LLC · owned by Albany Green Energy LLC

2023 · headline year
Capacity in service54.5MW1 unit · biomass
Net generation254GWh2023 · reported
CO₂ emitted11,245t2023 · reported to EPA · 5,737th highest of 6,030 in the US
Rank in Georgia#96of 247 · by capacity · #3,360 of 13,147 US
Reported suppliersNot reported2023
Capacity factor53%2023

Location

Dougherty County · SOCO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 6.21 TBtu · reported

CO₂ emitted, t · 2017–23

05,00010,00015,000201720202023
Reported (through 2023)

Generating units

1 of 1 shown · 54.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 154.5WoodWood/Wood Waste Biomass2017Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Albany Green Energy LLC · 100%
Operating utility
Albany Green Energy, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1012844
Balancing authority
SOCO
NERC region
SERC
EIA plant ID
60340

Common questions

How big is Albany Green Energy?
54.5 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Albany Green Energy LLC (100%) and operated by Albany Green Energy, LLC, filed as independent power producer.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017.
When is it due to retire?
No retirement date has been filed for any operating unit at Albany Green Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.
How much CO₂ does it emit?
11,245 t in 2023, reported to the EPA — the 5,737th highest of 6,030 US facilities that reported. Up from 4,313 t in 2017.

Related pages

Georgia energyAll facilities in the state→GRP Madison Renewable Energy Facility58.0 MW operating capacity→ Oe_ga357.5 MW operating capacity→ Hazlehurst II52.5 MW operating capacity→ Live Oak Solar, LLC51.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming