Glendale, Maricopa County, Arizona · SRP · operated by Salt River Project · owned by Salt River Project Agricultural Improvement & Power District
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit AF3 | 163.2 | Natural Gas | Natural Gas Steam Turbine | 1961 | Operating |
| Unit AF1 | 113.6 | Natural Gas | Natural Gas Steam Turbine | 1958 | Operating |
| Unit AF2 | 113.6 | Natural Gas | Natural Gas Steam Turbine | 1957 | Operating |
| Unit AF4 | 80.5 | Natural Gas | Natural Gas Fired Combustion Turbine | 1975 | Operating |
| Unit AF5 | 71.2 | Natural Gas | Natural Gas Fired Combustion Turbine | 1974 | Operating |
| Unit AF6 | 71.2 | Natural Gas | Natural Gas Fired Combustion Turbine | 1974 | Operating |
| Unit AF7 | 49.5 | Natural Gas | Natural Gas Fired Combustion Turbine | 2022 | Operating |
| Unit AF8 | 49.5 | Natural Gas | Natural Gas Fired Combustion Turbine | 2022 | Operating |
| Unit AFSB1 | 25.0 | Storage | Batteries | 2021 | Operating |
| Unit PV-3 | 0.2 | Solar | Solar Photovoltaic | 2001 | Operating |
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Kinder Morgan | Natural gas | 1.8 | n/a | n/a | Pipeline |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See the delivery history →