Proposed
A planned 60.0 MW batteries project, filed to come online in 2026.
Planned capacity60.0MW2 units · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →
Ownership & operations
- Operating utility
- AES Distributed Energy
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- HECO
- EIA plant ID
- 66066
Common questions
How big is AES Waiawa Phase 2 Solar?
60.0 MW across 2 units, none of which is in service — all planned.
Who owns and operates it?
Operated by AES Distributed Energy, filed as independent power producer.
Which grid does it sell into?
HECO (Hawaiian Electric Co Inc) is its balancing authority.
What does it run on?
Batteries (30.0 MW) and Solar Photovoltaic (30.0 MW).