AMERICAN ENERGY ATLAS
Industrial + power·California

Aera Energy San Ardo

San Ardo, Monterey County, California · CAISO · operated by Aera Energy LLC-San Ardo · owned by Cppib Vedder US Holdings LLC, Ikav Impact USA Inc and Oaktree Capital Group, LLC

2023 · headline year
Capacity in service3.2MW1 unit · gas · 1 more on standby or out of service
Net generation23.6GWh2023 · reported
CO₂ emitted293,762t2023 · reported to EPA · 1,244th highest of 6,030 in the US
Rank in California#1,038 (tied)of 1,713 · by capacity · #8,612 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Monterey County · CAISO · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 578,220 MMBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 3.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit UN-B3.2Natural GasNatural Gas Fired Combustion Turbine1989Operating
Unit UN-A3.0Natural GasNatural Gas Fired Combustion Turbine1989Out of service

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Aera Energy LLC-San Ardo
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Petroleum and Natural Gas Systems
EPA facility ID
1006846
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
55184

Common questions

How big is Aera Energy San Ardo?
3.2 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Cppib Vedder US Holdings LLC, Ikav Impact USA Inc and Oaktree Capital Group, LLC and operated by Aera Energy LLC-San Ardo, filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at Aera Energy San Ardo. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much CO₂ does it emit?
293,762 t in 2023, reported to the EPA — the 1,244th highest of 6,030 US facilities that reported. Up from 143,046 t in 2011.

Related pages

California energyAll facilities in the state→Turlock Lake3.3 MW operating capacity→ Whitethorn Solar LLC3.3 MW operating capacity→ 8500 Balboa PV, LLC3.2 MW operating capacity→ Bear Creek (CA)3.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming