CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1985. The oldest operating units are Unit GEN1 and Unit GEN2 (1985); the newest is Unit GEN3 (1986).
When is it due to retire?
No retirement date has been filed for any operating unit at Aera Energy Belridge. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much CO₂ does it emit?
1.29 Mt in 2023, reported to the EPA — the 475th highest of 6,030 US facilities that reported. Down from 1.43 Mt in 2011.