Coal supplies 90% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
7 of 7 shown · 180 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 2A
105.0
Subbituminous
Conventional Steam Coal
2009
Operating
Unit 1A
75.0
Subbituminous
Conventional Steam Coal
2009
Operating
Unit GEN3
9.4
Bituminous coal
Conventional Steam Coal
1965
Retired 2008
Unit GEN1
7.5
Bituminous coal
Conventional Steam Coal
1954
Retired 2008
Unit GEN5
7.0
Bituminous coal
Conventional Steam Coal
1991
Retired 2008
Unit GEN4
4.0
Bituminous coal
Conventional Steam Coal
1974
Retired 2008
Unit GEN2
3.5
Bituminous coal
Conventional Steam Coal
1940
Retired 2008
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 449 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
180 MW across 2 generating units in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Archer Daniels Midland Co (100%) and operated by Archer Daniels Midland Co, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. Every operating unit came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Adm Corn Processing. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned coal and biomass. Coal delivered in 2023 came from 2 coal suppliers, from mines in Wyoming and Illinois — principally North Antelope Rochelle Mine.
How much does it spend on fuel?
An estimated $72.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.95 Mt in 2023, reported to the EPA — the 310th highest of 6,030 US facilities that reported. Down from 2.06 Mt in 2011.