Adm Corn Processing

Cedar Rapids, Linn County, Iowa · MISO · operated by Archer Daniels Midland Co · owned by Archer Daniels Midland Co

2023 · headline year
Capacity in service295MW7 units · coal + gas
Net generation942GWh2023 · reported
CO₂ emitted2.75Mt2023 · reported to EPA · 198th highest of 6,030 in the US
Rank in Iowa#19of 256 · by capacity · #1,048 of 13,147 US
Reported suppliers42023 · 31 deliveries
Capacity factor37%2023

Location

Linn County · MISO · MRO

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

85% Coal · 20.6 TBtu · reported15% Natural gas · 3.56 TBtu · reported

Coal supplies 85% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 295 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN6101.1SubbituminousConventional Steam Coal2000Operating
Unit GEN738.5Natural GasNatural Gas Fired Combustion Turbine2016Operating
Unit GEN131.0SubbituminousConventional Steam Coal1988Operating
Unit GEN231.0SubbituminousConventional Steam Coal1988Operating
Unit GEN331.0SubbituminousConventional Steam Coal1988Operating
Unit GEN431.0SubbituminousConventional Steam Coal1988Operating
Unit GEN531.0SubbituminousConventional Steam Coal1995Operating

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 4 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Peabody Coal SalesCoal14.8843,024North Antelope Rochelle Mine, Wyoming + 1 moreRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 474 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 4 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Archer Daniels Midland Co · 100%
Operating utility
Archer Daniels Midland Co
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Other, Waste
EPA facility ID
1006047
Balancing authority
MISO
NERC region
MRO
Gas pipeline
Midamerican Energy Company
EIA plant ID
10864

Common questions

How big is Adm Corn Processing?
295 MW across 7 generating units in service — 256 MW of coal and 38.5 MW of natural gas.
Who owns and operates it?
Owned by Archer Daniels Midland Co (100%) and operated by Archer Daniels Midland Co, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1997. The oldest operating units are Unit GEN1, Unit GEN2, Unit GEN3 and Unit GEN4 (1988); the newest is Unit GEN7 (2016).
When is it due to retire?
No retirement date has been filed for any operating unit at Adm Corn Processing. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned coal and natural gas. Coal delivered in 2023 came from 3 coal suppliers, from mines in Wyoming and Illinois — principally North Antelope Rochelle Mine. Other fuels (natural gas) came from 1 supplier in 2023.
How much CO₂ does it emit?
2.75 Mt in 2023, reported to the EPA — the 198th highest of 6,030 US facilities that reported. Down from 3.02 Mt in 2011.

Related pages

Iowa energyAll facilities in the state→Pioneer Prairie Wind Farm300 MW operating capacity→ Upland Prairie299 MW operating capacity→ Burlington (IA)291 MW operating capacity→ Pomeroy Wind Farm286 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming