Fuel spend$02023 · no purchased fuel
Capacity in service6.8MW1 unit · solar
Rank in California#819 (tied)of 1,713 · by capacity · #6,187 (tied) of 13,147 US
How big is Adelanto Solar Project?
6.8 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Los Angeles Department of Water & Power, filed as municipally owned utility.
Which grid does it sell into?
LDWP (Los Angeles Department of Water and Power) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2012.
When is it due to retire?
No retirement date has been filed for any operating unit at Adelanto Solar Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (6.8 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.