AMERICAN ENERGY ATLAS
Power·California

Abel Road Bioenergy

Colusa County, California · CAISO · operated by ACC Renewable Resources

2023 · headline year
Capacity in service4.0MW1 unit · biomass
Net generation17.3GWh2023 · reported
Rank in California#977 (tied)of 1,713 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor49%2023

Location

Colusa County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 491,239 MMBtu · reported

Reported fuel consumption, MMBtu · 2022–23

0200,000400,000600,00020222023
Reported (through 2023)

Generating units

1 of 1 shown · 4.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit BMORC4.0Agricultural byproductsOther Waste Biomass2022Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
ACC Renewable Resources
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
65517

Common questions

How big is Abel Road Bioenergy?
4.0 MW across 1 generating unit in service.
Who owns and operates it?
Operated by ACC Renewable Resources, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2022.
When is it due to retire?
No retirement date has been filed for any operating unit at Abel Road Bioenergy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

California energyAll facilities in the state→RCWD PV Project4.1 MW operating capacity→ Valley View4.1 MW operating capacity→ Apple Campus 2 Fuel Cell4.0 MW operating capacity→ Arrache 80834.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming