Bee County, Texas · ERCOT · operated by Abeja Solar Farm LLC
Capacity shown is planned or not in service
A planned 200 MW solar photovoltaic project, filed to come online in 2027.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit ABPV1 | 200.0 | Solar | Solar Photovoltaic | 2027 | Proposed |
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit ABPV1 | new unit | 2027 | 200 MW |